Its Done! kinda


The windows and doors for the other side finally decided to show up.  I also added the glazing and the shades in the windows.  The only thing not yet done is the steps on the passenger platform and the front of the depot.  I cant decide what to do for the front steps.  Here is some photos of the depot, but this is the front which hasn't been shown until now.     



Saturday, July 26, 2008

Depot Progress #3


The depot is about 95% done.  The windows for the other side should show up on Monday or Tuesday.  After they are painted and in place I will spray with a good coat of dullcote.  Then I can install the glazing and window shades.  I have a little work to do on the chimney and a few other roof details and finally  the steps off of the passenger platform and the main entry way.  In total only about two to three hours left and it is done.  Then its on to the Farmers Co-op / Grain Elevator. 






Saturday, July 19, 2008

Depot Progress #2


This little depot is flying along.  I just need to finish some details under the roof and shingle the thing, but those are on order along withe rest of the doors and windows for the other side. 



Thursday, July 17, 2008

Depot Progress

Just showing the progress of the depot.



Tuesday, July 8, 2008

Beginings of the Depot


Yesterday the wood I ordered decided to show up, so I went ahead and started construction of the depot.  So far everything is going smoothly.  This is the first scratch built building I have done using wood and so far I really like it.  When I start doing my module for the club most of the buildings will be wood, so I can't wait to start those.  The walls to the main waiting area is all that is up as of yet, I hope to have the freight house up soon.  Please enjoy the very pictures of the depot is it's infancy.   


Monday, June 23, 2008

The Plans

I have become involved with a group of shadowy individuals, we call our selves the Junction City N-Scalers. We have been hashing out plans for our club layout that we are planning to begin construction on in August. In the meantime I have been given the task of designing and building the structures on one of the modules. So far I have the elevations done for the depot & the co-op/grain elevator. I hope you can click on them to view a larger version other wise you wont be able to see much.