The depot is about 95% done. The windows for the other side should show up on Monday or Tuesday. After they are painted and in place I will spray with a good coat of dullcote. Then I can install the glazing and window shades. I have a little work to do on the chimney and a few other roof details and finally the steps off of the passenger platform and the main entry way. In total only about two to three hours left and it is done. Then its on to the Farmers Co-op / Grain Elevator.
No comments:
Post a Comment