Okay here on post #2 I have two things to talk about that have made me very excited.
#1 - ALL THE WINDOWS ARE DONE!!!!!!!!!
#2 - All faces are done.
Sorry but I couldn't help but over emphasize the fact that the windows are done and yes all faces (walls) are done. So now my list of to-do's is beginning to get short, What's left?
- Glazing and shades for windows
- Roof
- Mezzanine
- First floor interior
- Details and Signage
For the show I will be also making a little base for it to rest on. But that is the list in a nutshell.
These are a few more photos of the finished windows on the top two floors and a few other overviews.
Until next sunday.
2 comments:
Hi Christopher. First time I dropped into your site. That is quite the building you are making. I am impressed with the character of the structure and the detail you are putting into it. Looking forward to seeing more in the future.
Chris, thanks for the kind words, they mean allot. Don't know if you knew that the prototype is in Vancouver, BC and for a short time was the tallest building not only in Canada, but the entire british empire.
Post a Comment